Sign up to receive a text message or email when new bids are added!
Bid Number: 2018-01
Bid Title: Rink Compressor Replacement
Category: City Bids & Solicitations
Status: Closed

The contractor shall have the sole responsibility to procure and install the compressor adhering to all manufacturer specifications and recommended installation standards/methods, including the following:

--Disconnect and remove compressor No. 2, Carrier 5H126A219, with water-cooled heads and oil cooler.

--Provide and install a factory-rebuilt Carrier 5H126A219 with water-cooled heads and oil cooler.

--Contractor must flush out circuit No. 2 refrigerant line to remove excess oil.

--Add Glycol to condenser side of system to 5 degrees.

--Reconnect compressor, fully charge system with R-22 Refrigerant.

--Compressor must be fully operational upon completion.

Please see the attached file below for the complete bid specifications.

Publication Date/Time:
1/2/2018 1:31 PM
Closing Date/Time:
1/12/2018 11:00 AM
Bid Opening Information:
See bid-spec documents
Addendum Date/Time:
Pre-bid Meeting:
01/09/2018, 3:30 PM, WHHS
Contact Person:
Questions must be emailed to Robert Sandella, West Haven Purchasing Agent, at No phone calls.
Related Documents:

Return To Main Bid Postings Page